Tuesday, May 22, 2012

Seed test Day 16

Day 16 Control

Day 16 NitroMax

Day 16 System D

Day 16 side by side comparison

Day 16 Control Measurement (about 3 cm)

Day 16 NitroMax measurement (about 5 cm)

Day 16 SystemD measurement (about 6cm)

Day 16 side by side comparison

Day 16 Control root measurement (about 5 cm)

Day 16 NitroMax root measurement (about 6 cm)

Day 16 root measurement (about 6cm)

Day 16 NitroMax feeder roots

Day 16 SystemD feeder roots

Day 16 Control feeder roots

This is not part of the test group, but they are the prior plants picked and measured from the three groups. Notice the feeder roots growing out of the bottom of the planter and spreading out into the petri dish.
The three groups are beginning to crowd the seedling containers, so on the 16th day of the test, the largest of each group were removed and replanted in a 3X6 rack and placed outside using store bought potting soil. Great care was taken to preserve hair and feeder roots  and to avoid disturbing the growing medium, as much as possible.

Tuesday, May 15, 2012

Mycorrhizal seed test day 8

Day 8 Control Radish

Day 8 NitroMax/Mycor Radish

Day 8 SystemD/Mycor Radish

Day 8 Mycor Radish

This isn't part of the test group, but I added it in to show the results of 7 days germination for squash

Day 8 Control Cuke-Eggplant-Cabbage

Day 8 NitroMax/Mycor Cuke-Eggplant-Cabbage

Day 8 SystemD/Mycor Cuke-Eggplant-Cabbage

Day 8 Mycor Cuke-Eggplant-Cabbage



















Monday, May 14, 2012

Seed test Day 14

Day 14 Control

Day 14 NitroMax

Day 14 SystemD

Day 14 Control measurement

Day 14 NitroMax measurement

Day 14 SystemD Measurement

Day 14 Control root measurement

Day 14 NitroMax root measurement

Day 14 SystemD root measurement

Day 14 Control feeder roots

Day 14 NitroMax feeder roots

Day 14 SystemD feeder roots

Friday, May 11, 2012

Mycorrhizal seed test Day 5

Day 5 Control (Cuke, Eggplant, and Cabbage)

Day 5 Control Radish

Day 5 Mycor Radish

Day 5 Mycor (Cuke, Eggplant, and Cabbage)

Day 5 NitroMax/Mycor Radish

Day 5 NitroMax/Mycor (Cuke, Eggplant, and Cabbage)

Day 5 SystemD/Mycor Radish

Day 5 SystemD/Mycor (Cuke, Eggplant, and Cabbage)

Seed test Day 11

Day 11 Control

Day 11 Control Measurement (about 3cm)

Day 11 NitroMax

Day 11 NitroMax measurement (about 3 1/2cm)

Day 11 SystemD

Day 11 SystemD measurement (almost 5 cm)

Day 11 Control root measurement (about 8 cm overall)

Day 11 NitroMax root measurement (about 10 cm)

Day 11 NitroMax feeder roots

Day 11 SystemD feedr roots

Day 11 SystemD root measurement (about 12cm)

Day 11 Control feeder roots